Grade levels where moisture conditions do not exist.
Installing 3 4 oak flooring.
At the bottom we provide links to posts on the tools we use and frequently recommend for hardwood.
Acclimate cull and blend flooring.
It is the responsibility of the installer and owner to ensure that job site.
It provides detailed instructions for installing hardwood flooring over a wood substructure.
There is a full basement living space under first floor.
Depending on what width hardwood you are installing this line will be different.
Have not purchased flooring yet but plan on using bruce america s best choice 3 4 oak 3 1 4 wide planks have not decided on underlayment yet but would like something to quiet the floors.
Begin with the first row pre drilling holes.
Here s how to install flooring using the staple down method.
Determine a starting wall.
Includes planning equipment and material acquisition area preparation and protection setup and cleanup.
It chronicles tutorials for each step of the process derived from our installation of 3 4 inch solid tongue and groove brazilian walnut hardwoods in our own home.
We continuously make technological advancements that improve product installer owner responsibility.
Typically used for engineereed hardwood staple down installation works well with 3 8 5 8 inch flooring.
We first ran this article in 2010.
If you are working atop a single plywood layer we recommend adding a second layer of 1 4 to 1 2 inch plywood or commercial floor substrate material.
Install underlayment on clean level subfloor.
This flooring can be installed over old wood flooring or over a plywood sub floor.
3 4 solid rev 012113 page 1 3 4 solid hardwood flooring installation instructions.
Hardwood flooring installation is a big project but you can install solid hardwood floors yourself to save money with this step by step video.
Next using your hammer insert a nail 1 inch from the wall and about every 4 inches along the board.
When possible always begin the layout from the straightest wall which usually tends to be an outside wall.
Expansion gaps of 3 4 are required between flooring and all walls in room.
Use wood or drywall screws to attach the substrate to the floor.
A minimum 3 4 inch thick sub floor is required.
Use a pneumatic flooring nailer or a nail gun to drive the.
Blind nail wood flooring.
Oak flooring installation labor basic basic labor to install oak flooring with favorable site conditions.
Direction of the flooring should be installed at a 90 degree right angle to the floor joists.